Digging out a pool is one of the bigger jobs a homeowner or builder can take on with a mini excavator. A little planning before the machine arrives makes the difference between a smooth dig and a frustrating one. This guide covers the practical side: getting the machine in, dealing with the soil, choosing buckets and working out how long to hire for.
Start with a clear plan
Before you book, have the pool's shape, size and depth marked out on the ground. If a pool builder or designer is involved, get their plans and talk through what they expect you to dig and what they will finish themselves. Spray paint or string lines around the outline give you a clear target from the operator's seat, and a few reference pegs with depth marks help you check progress as you go.
Think about the order of work too. Many people dig the bulk of the hole first, then come back to trim the sides and floor. Knowing your sequence helps you choose the right bucket at each stage and avoid moving soil twice.
Check access to the yard
Walk the path from the street to the dig site. Measure gate openings, side paths and any tight corners, and look for things that could get in the way such as garden beds, low branches, steps, retaining walls or soft ground. Remove gates or panels where you can, and protect driveways and paths you need to track over. If you are unsure whether the machine will fit, check with us before booking.
Plan where the soil goes
A pool dig produces a surprising amount of soil, and it takes up even more space once it is dug out. Decide early where it will go. Options include spreading some around the yard, keeping some for backfill and landscaping, and arranging skip bins or trucks to take the rest away. Place your spoil pile far enough from the edge of the hole that it does not slump back in, and so you are not carrying every load across the whole yard.
If trucks or bins are coming, time their arrival with your dig so you are not waiting on them with the machine sitting idle.
Choosing buckets
The Kubota U17-3HG is available with 300mm, 450mm and 1000mm buckets and a ripper. As a general guide:
- A wider bucket moves more soil per pass and gives a cleaner, flatter finish on the floor and batters.
- A narrower bucket is handy for tighter spots, corners and any trenches for plumbing or electrical runs around the pool.
- The ripper can help break up hard or compacted ground before you dig it out with a bucket.
Tell us what ground you expect when you book so you have the right attachments on site.
How long to hire for
Dig time depends on the size of the pool, the soil, access and how quickly the spoil can be moved away. Allow extra time for trimming the shape and for any delays such as weather or waiting on trucks. Multi-day rates work out cheaper per day than a single day, and builders may find the Builders week (5 days with a 12 machine hour cap) suits a planned dig. You can compare options and add delivery with the hire estimator.
Before you dig
Underground services such as water, gas, power and telecommunications can run through a backyard. We recommend contacting Before You Dig Australia before any digging, and allowing time for the information to come back before your hire starts.