Excavator Hire for Trenching and Drainage

Practical tips for trenching and drainage work with a dry hire mini excavator in Brisbane.

Trenching is one of the most common reasons to hire a mini excavator. Drainage lines, stormwater runs and trenches for other services are slow and hard work by hand, but quick and tidy with the right machine and bucket. This guide covers planning the route, choosing a bucket width, managing spoil, keeping your falls right and working out how long to hire for.

Plan the route

Start by deciding exactly where the trench will run, from start point to outlet. Mark the line clearly with spray paint or a string line, and note any changes in direction. Look for obstacles along the way, such as tree roots, paths, garden beds, fences and existing pits or pipes. A straight, simple route is quicker to dig and easier to lay pipe in.

If a plumber, drainer or builder is involved, confirm the route, depth and width with them before you start, so the trench suits what they plan to install.

Choosing a bucket width

The Kubota U17-3HG is available with 300mm, 450mm and 1000mm buckets and a ripper. For trenching, match the bucket to the trench you need:

  • The 300mm bucket suits narrow trenches, where you want to remove only as much soil as needed.
  • The 450mm bucket gives more working room in the trench for larger pipes or pits.
  • The 1000mm bucket is useful for tidying up, backfilling and levelling the surface once the work is done.
  • The ripper can help break up hard or compacted ground ahead of the bucket.

Managing spoil

Decide which side of the trench the soil will go before you start, and keep it on that side for the whole run. Place the pile back from the edge so it does not fall back into the trench, and leave yourself room to lay pipe and move along the line. Keeping the spoil close and in one place makes backfilling much faster at the end of the job.

Getting the falls right

Drainage relies on a steady fall so water keeps moving toward the outlet. Agree the fall you need with whoever is installing the pipe, then check it regularly as you dig rather than at the end. A string line, level or laser set up along the trench makes this easier. Dig slightly shallow at first and trim to the final depth, as it is easier to take a little more out than to fill and compact a trench that is too deep.

How long to hire for

Trench length, depth, ground conditions and the number of runs all affect how long the job takes. Remember to allow time for backfilling and cleaning up, not just digging. If you also have post holes to bore, the optional auger drive can be added to the same hire. Builders with a planned week of work may suit the Builders week, which is 5 days with a 12 machine hour cap. Compare totals with delivery in the hire estimator.

Before you dig

Trenches often cross the same ground as existing underground services. We recommend contacting Before You Dig Australia before any digging, and planning your route once you have the information back.

Next steps